Suyoc Consolidated Mining Company Suyoc Consolidated treated 6,545 tons of ore during September, from which P146,558.10 was recovered, a recovery per ton of P22.39. Extraction was 86.54%. The development advance was 1,386 feet, 966 feet of capital and 420 feet of operating advance. Of the capital advance 77 feet were in ore, as \vere 15 feet of the operating development. The 1846 winze continues in ore of E. E. Elser, Inc. better than average grade and width. The No. 1 shaft was sunk 45 feet dµring September and is 77 feet below the 2000 station. Heavy and squeezing ground encountered in this shaft has necessitated the placing of additional center supports to prevent failure of the wall plates. Operations in general were normal, with operating expenditures slightly below those of August. All Farms of Insurance Telephone 2-24-28 P. 0. Box 598 MANILA, 16 THE MARSMAN MAGAZINE for October, 1938